Monday, 26 May 2014

Rebuild # 4


Sand off old blue paint (ebay specials)


Undercoat with plastic primer

Looking a lot better


Grey/Silver base coat and Red top coat

Clear coat number 3
Looking great

Mask and spray black panel



Now add the black panels

Gold and white stickers were a pain to fit

Tank is LUSH

Friday, 14 February 2014

Rebuild # 3


Left Grip on.
Right also.
Re Zinc brake cam.
In place
Brake lever in.

Gear shift on.
Starting to look like a bike.
Re-chrome garud,
New positive cable.


All lights working

Saturday, 7 December 2013

Rebuild # 1

First in is the newly run in motor.













New head bearings chill so they slide in easy.












In place now on with the triple clamps.













The kit from pyramid was not an easy fit the top race was proud 7mm and the bottom went well inside so i needed to add a 2mm washer on the bottom, I did have this in another kit for my Kawasaki S 3.
I had to remove the bottom bearing off the triple shat to add the spacer, a big pain but done now.















Top race nips up in the correct place now.












New re hard chromed forks and seals on next.



















Center stand next.














re Zinc spring and arm thanks to John Fisher, great job.








All greased up and new split pin.

Friday, 6 December 2013

The Lump into the frame single handed.


Bike Lift waiting.
















Engine on its side Gen uppermost ready to lower the frame over.















Frame suspended by several bungees.

















Plenty of newspaper for protection, I don't want to scratch the frame now.










Slowly raising the lift and tweaking the frame easy does it. Spot the deliberate mistake, oil filter still on.

Shes in, it must of taken 30 mins of pushing and shoving but well worth looking after the frame.














Up right and on my scissor jack.
















Looking good just the lower bolts in for now.






OK now the hard part is done we can get on with the build.