Wednesday 9 October 2013

Operation Engine Rig

I have two options 
1. Put the rebuilt engine in the frame run for 500 miles then take the engine out to torque the head down then put it back in. 
2. Build a rig to run the engine on then torque the head and the put  in the frame minimising the damage to the new powder coating on the frame.


Option 2 has the added ability to balance the carbs and get the tappet gap spot on with no awkward angles to work the feeler gauge.





Lets spray the block first

















Headers fitted.














I will try and fit an old silencer so I can run without going deaf 














One butchered silencer fitted.

Fabricate a oil tank bracket.













Looking good.












Battery box done now on the the coil holder.

























No comments:

Post a Comment